Brief intake
Contact Indoor Led Display Sourcing with the open specification
Use this page when the display task is ready to leave your team. The strip above is only a title band. The working area below pairs the requirement brief with the form so the page is not a copy of the small quote dialog.
Requirement brief
Write the application, pixel pitch, finished size, brightness target, quantity, US destination and requested timing. Add voltage if you know it. Add the control path and whether service is from the front or the rear. Drawings can be referenced by title and revision; the form does not accept a file upload.
- Application and duty hours
- Pitch, dimensions, resolution, viewing distance
- Quantity and destination
- Optional budget, currency, per cabinet or whole order
- Supplier preference: high-end, mid-range, budget-friendly, or undecided
How replies are handled
There is no published street address, telephone number or office-hour clock, because those details are not on file for this desk. Communication starts from the form. A reviewer checks missing fields, then looks for factories that can quote the written scope. No reply interval is stated on this page.
If the wall is already partly designed, name the revision of the architectural elevation and the coordinate system used for width and height. Say whether dimensions are finished opening or active image area. A mismatch between those two numbers is a common reason two factories quote different pixel counts for what the buyer thinks is one sign. Also note dock height, freight elevator size and the floor the cabinets must reach, because packaging and module weight affect whether a quotation should include site delivery or stop at the port. A sample intake line is pitch 2.5 mm, opening 3200 mm wide, input voltage unknown, service access from the front, and a whole-order budget still blank.
Stock, a calendar date, a safety mark, or a price. Those appear only if a named supplier writes them for the named model. Social channels are not operated from this site. If you need a status check, reply on the email thread that follows a real submission.
Procurement form
The same field names as the dialog are used here, with room for a longer note. Budget and supplier preference stay optional helpers.